A cycle time of sub-two seconds for a rigid package in a four-cavity tool is impressive in anyone’s books but when that cycle time also includes an in-mold labeling step, it’s surely swift. Such a process is being demonstrated at the Stork booth (13/D72). A cycle time of sub-two seconds for a rigid package in a four-cavity tool is impressive in anyone’s books but when that cycle time also includes an in-mold labeling step, it’s surely swift. Such a process is being demonstrated at the Stork booth (13/D72). Tagging Options Domain: All Sites read more
Read the original post:
K 2013: Is this the fastest injection machine at the show?